Project Objectives were established based on the existing conditions and identified needs/deficiencies within the project corridor. This information, along with descriptions of the alternatives evaluated and social, ecomonic and environmental consequences, was presented in a Draft Design Report dated March 2001. |
|
The Project Objectives are as follows: |
|
• Restore the existing pavement section to provide good structural and ride-ability conditions for a service life of 50 years, thereby reducing maintenance costs. |
|
|
• Improve overall traffic conditions through improvements at key intersections to provide an acceptable Level of Service (i.e., LOS D or better). (Definition of Level of Service) |
|
|
• Improve safety conditions at identified accident locations and reduce the accident rate in a cost-effective manner. |
|
|
• Improve aesthetics and enhance potential for economic viability along the corridor, especially in the downtown area, through the implementation of streetscaping concepts and landscaping improvements. |
|
|
• Provide adequate drainage for surface and subsurface runoff. |
|
|
• Improve and accommodate existing and future pedestrian circulation and bicyclist mobility. |
|
|
• Provide safer and more efficient access to Route 5, Main Street, through the implementation of access management strategies. |
|